Scoping and design · 31:01
CMMC Scoping: How to Draw and Shrink Your CUI Boundary
Conference session title: Scoping: Drawing Your Boundary (CMMC-PNW 2026, Day 1)
What this session covers
Scoping decides the size, cost, and difficulty of everything else in CMMC. John Nolan walks through the two diagrams every assessment depends on: a network design diagram that shows your whole environment, and a CUI data flow diagram that shows where CUI actually goes. His method is to start wide, including people, hardware, software, cloud platforms, and vendors, then prune to only what stores, processes, or transmits CUI. He also covers enterprise versus enclave, what you can inherit from a vendor's shared responsibility matrix, and how to scope for contracts you have not won yet.
Speaker
John Nolan, ISI Enterprises
Vice President of Compliance at ISI Enterprises, one of the first CMMC-certified MSPs. He has 23 years in IT, 10 of them focused on DoD contractors, led ISI's own Level 2 assessment with zero POA&Ms, and has overseen more than 150 CMMC gap assessment and remediation projects.
Chapters
- 0:00Why does scoping get overlooked when companies prepare for CMMC?
- 0:57Which two diagrams does every CMMC scope need?
- 1:50Why can't one person build the scope alone?
- 2:49Should you start with a CMMC diagram or your whole corporate network?
- 3:19What hardware belongs on the network diagram?
- 4:32Which software and cloud platforms get missed most often?
- 5:27How do your vendors change your CMMC scope?
- 7:44How do you verify a vendor is actually certified? Ask for the SPRS UID
- 8:49Are home offices and home networks in scope for remote teams?
- 9:52Can you scope out printing and removable media?
- 11:44What is a shared responsibility matrix, and what can you inherit?
- 13:07How do you build a CUI data flow diagram?
- 14:31Why you have to ask every department how they really work
- 16:26What does a failed CMMC assessment actually cost?
- 17:23Enterprise or enclave: which scope are you choosing?
- 19:14How does an enclave reduce licensing and assessment cost?
- 20:46Two accounts, two laptops, or virtual desktops?
- 22:48How do you scope for the contracts you have not won yet?
- 24:40What should trigger an update to your diagrams, SSP, and POA&M?
- 26:06Q and A: where do AI tools fit inside your CUI boundary?
- 29:35Summary: what a good diagram saves you
